Relay Coordination Study is a key part of electrical protection engineering. In this way, it helps ensure that the protective relay closest to a fault operates first, while upstream devices provide backup if the primary protection or circuit breaker does not clear the fault. Correct coordination can reduce unnecessary outages and help protect cables, transformers, motors, generators and other electrical equipment.
To carry out the study, engineers use network data, short-circuit results, protective-device characteristics and equipment limits. In addition, the study reviews relay pickup values, time delays, operating curves and breaker clearing times under relevant operating conditions.
In practice, a Relay Coordination Study is normally performed as part of wider Power System Studies and is closely linked with Load Flow Analysis, Electrical Network Analysis, and Transformer Protection.

Relay coordination study: protection relays, substation equipment and time-current characteristic curves.
Table of Contents
- What Is a Relay Coordination Study?
- Why Relay Coordination Is Important
- Primary and Backup Protection
- Understanding Time-Current Curves
- Key Relay Coordination Settings
- Relay Coordination Study Methodology
- Devices Included in Coordination
- Fault Scenarios and Operating Conditions
- Common Coordination Problems
- Study Deliverables
- Software Used
- Industrial Applications
- Frequently Asked Questions
- Related Engineering Services
- Conclusion
What Is a Relay Coordination Study?
At its core, a Relay Coordination Study evaluates whether protective devices operate in the intended sequence when an electrical fault occurs. More specifically, it checks that the primary protective device isolates the smallest practical part of the network while upstream protection remains available as backup.
For example, if a fault occurs on a feeder, the feeder relay should normally trip its associated circuit breaker before the upstream incomer relay operates. Otherwise, if the feeder breaker fails or the primary relay does not clear the fault, the upstream protection should operate according to the approved protection philosophy.
To make this assessment, the study uses time-current characteristics, fault-current calculations, equipment damage limits and device operating times to assess selectivity and backup protection. Depending on the system, it may include overcurrent, earth-fault, differential, distance, motor and generator protection functions.
Typical Objectives
- Achieve selective fault isolation wherever practical.
- Coordinate primary and backup protective devices.
- Check relay pickup and time-delay settings.
- Review circuit-breaker interrupting and clearing times.
- Reduce unnecessary trips and avoidable production interruptions.
- Check protection sensitivity against minimum fault current.
- Document settings, assumptions and coordination results.
Why Relay Coordination Is Important
More importantly, electrical faults must be cleared quickly enough to limit equipment stress, but protection should not disconnect healthy sections of the network unnecessarily. Poor coordination can cause an upstream breaker to trip for a downstream fault, interrupting a wider area than required.
As a result, a properly engineered Relay Coordination Study helps balance selectivity, sensitivity, speed and backup coverage. Even so, these objectives can conflict, so settings must be reviewed in the context of the actual network and its operating requirements.
Benefits of a Well-Coordinated Protection System
- Selective operation: the protective device nearest to the fault is given the opportunity to clear it first.
- Backup protection: upstream devices provide a defined backup when primary protection fails.
- Equipment protection: relay operation is reviewed against cable, transformer and motor limits where applicable.
- Operational continuity: unnecessary loss of healthy feeders or sections can be reduced.
- Clear documentation: settings and assumptions can be reviewed during commissioning and future modifications.
Primary and Backup Protection
First, primary protection is intended to detect and clear a fault in its designated zone or circuit. Backup protection provides an additional layer if the primary relay, trip circuit or circuit breaker fails to clear the fault as expected.
| Protection role | Purpose | Coordination consideration |
|---|---|---|
| Primary protection | Clears faults in the protected circuit or zone. | Should operate within its designed operating time and sensitivity. |
| Local backup | Provides backup close to the protected equipment, where applied. | Must coordinate with primary protection and associated breaker-failure logic. |
| Upstream backup | Clears a fault if downstream protection fails. | Requires an appropriate time margin or a suitable scheme-specific coordination method. |
| Unit protection | Protects a defined zone using quantities such as differential current. | Requires correct zone boundaries, CT performance and scheme-specific checks. |
However, not every protection function is coordinated using a simple time delay. Differential and distance schemes, for example, may require zone, reach, stability, communications or grading checks appropriate to their design. The study method should match the protection function.
Understanding Time-Current Characteristic (TCC) Curves
In particular, time-current characteristic curves show how a protective device's operating time varies with current. Engineers plot relevant relay and fuse curves on a common current basis to assess whether devices operate in the intended sequence.
Inverse-time overcurrent relays generally operate faster as current increases above pickup, subject to the selected curve and settings. By comparison, definite-time functions operate after a configured delay once their operating condition is met. Actual curve behaviour depends on the relay model, selected characteristic and settings.
What Engineers Review on TCC Curves
- Relay pickup or current setting.
- Time multiplier, time dial or definite-time delay.
- Inverse-time curve type and tolerance bands.
- Downstream and upstream relay operating times.
- Fuse curves and equipment damage or withstand limits, where applicable.
- Circuit-breaker clearing time and relay overtravel or tolerance considerations, as applicable.
- Maximum and minimum fault currents at relevant locations.
Therefore, coordination margins should not be selected as a universal fixed value. They depend on the relay and breaker technology, tolerances, scheme design, applicable standards and the project's protection philosophy.
Key Relay Coordination Settings
Before selecting final values, relay coordination settings are developed from system studies and equipment information. For this reason, the engineer should confirm the device function, current-transformer ratio, relay input rating, fault-current range and protected equipment requirements before finalising settings.
| Setting or check | What it means | Engineering review |
|---|---|---|
| Pickup current | Threshold at which the protection function detects an operating condition. | Check load, overload capability, minimum fault sensitivity and CT ratio. |
| Time multiplier / time dial | Adjusts operating time for applicable inverse-time curves. | Review downstream and upstream grading across the fault-current range. |
| Definite-time delay | Applies a set delay after the function operates. | Verify selectivity, fault-clearing requirements and backup timing. |
| Instantaneous element | Provides fast operation above a configured threshold. | Check reach, downstream faults, inrush or transient effects where relevant. |
| Earth-fault setting | Detects ground-fault conditions using the scheme's measured quantities. | Review earthing method, residual measurement, leakage and minimum fault current. |
| CT ratio and class | Defines how primary current is represented to the relay and its measurement performance. | Confirm ratio, polarity, burden and suitability for the protection function. |
| Breaker clearing time | Includes the time required for the circuit breaker to interrupt current. | Use project or manufacturer data and include it in the overall protection assessment. |
For this reason, settings should be validated against the relay manufacturer's instructions and the approved study criteria. Final values should be documented in a setting schedule and independently reviewed where required by project procedures.
Relay Coordination Study Methodology
To begin, a structured methodology helps ensure that the study reflects the actual electrical network and produces settings that can be reviewed, approved and implemented.
Step-by-Step Engineering Workflow
- Collect project documents: obtain the latest Single Line Diagram, equipment schedules, cable data, transformer data and existing relay settings.
- Confirm network configuration: identify normal and alternate supply arrangements, bus couplers, tie breakers and relevant switching states.
- Review load flow results: establish operating currents and loading conditions where required for setting selection.
- Obtain short-circuit results: identify maximum and minimum fault currents at relevant buses and circuits.
- Confirm protection devices: record relay models, CT ratios, breaker data, fuse details and protection functions.
- Define coordination criteria: establish the required selectivity, sensitivity, backup philosophy and grading approach.
- Develop and plot settings: create TCC plots and review device operation over the relevant current range.
- Check equipment limits: compare applicable curves with cable, transformer, motor or other equipment withstand limits.
- Review operating cases: repeat checks for relevant source, generation, tie-breaker and network configurations.
- Document recommendations: prepare setting schedules, plots, assumptions, exceptions and conclusions for review.
- Support implementation: verify approved settings during commissioning and update documentation after changes.
In some cases, the process may require iteration. A setting that improves selectivity in one case may reduce sensitivity in another, so engineers should assess the overall protection performance rather than optimise one curve in isolation.
Devices Included in a Relay Coordination Study
Depending on the project, the devices included depend on the project scope and the protection architecture. A typical industrial or utility study may consider several device types and functions.
- Overcurrent and earth-fault relays: used for feeder, incomer and backup protection.
- Transformer protection: includes applicable differential, restricted earth-fault, overcurrent and earth-fault functions.
- Motor protection: considers overload, short-circuit, earth-fault and other motor-specific functions where included.
- Generator protection: reviews generator-specific protection and its interaction with the wider system.
- Fuses and circuit breakers: their operating characteristics and clearing times may affect selectivity.
- Busbar and breaker-failure schemes: require scheme-specific logic and timing checks rather than only simple TCC grading.
- Distance protection: may require reach, zone timing, load encroachment and communications-scheme review as applicable.
Coordination does not mean forcing every device onto one common curve. Each function should be assessed using the method appropriate to its operating principle and the protection design.
Fault Scenarios and Operating Conditions
Similarly, relay settings should be checked against the credible operating conditions defined for the project. Source availability, transformer parallel operation, generator dispatch and tie-breaker status can change fault-current levels and the protection sequence.
Typical Cases to Review
- Maximum three-phase fault current at relevant buses.
- Minimum phase-fault current at the remote end of a protected circuit.
- Earth faults under the applicable system earthing arrangement.
- Utility supply and alternate-source configurations.
- Transformers or generators operating in parallel, where applicable.
- Bus coupler or tie breaker open and closed conditions.
- Motor contribution or embedded generation, where relevant.
- Changes to equipment or network configuration proposed for expansion.
Where multiple settings groups or adaptive protection functions are used, the study should also verify when each group is selected and whether the selection logic matches the intended network configuration.
Common Relay Coordination Problems
In many projects, coordination issues often arise from incomplete input data, settings copied from another installation, or changes to the network that were not reflected in the study. These issues can lead to nuisance tripping, slow fault clearance or insufficient backup protection.
Common Issues to Avoid
- Using outdated Single Line Diagrams or relay setting files.
- Assuming maximum fault current is the only case that matters.
- Setting pickup too high to detect the minimum fault current.
- Using time delays without checking upstream and downstream curves.
- Ignoring circuit-breaker clearing time and device tolerances.
- Failing to check equipment withstand or damage curves where applicable.
- Overlooking CT ratio, polarity, wiring or relay input configuration.
- Applying a generic grading interval without considering device characteristics.
- Not reviewing alternate operating configurations.
- Failing to update settings documentation after commissioning changes.
Typical Relay Coordination Study Deliverables
For effective implementation, a complete report should explain the study basis and provide enough information for the settings to be reviewed and implemented. In each case, the exact deliverables depend on the agreed project scope.
- Study scope, assumptions and applicable criteria.
- Network configuration and equipment data summary.
- Fault-current data used for coordination.
- Time-current coordination plots.
- Recommended relay setting schedules.
- Review of primary and backup protection.
- Exceptions, limitations and recommendations.
- List of required field verification or commissioning checks.
- Final report and supporting calculation files, where included in scope.
Software Used for Relay Coordination Studies
To support this work, electrical power system software can help engineers model devices, calculate fault currents, plot time-current curves and document protection settings. Ultimately, the choice of platform depends on project complexity, available device libraries, study requirements and client specifications.
Commonly Used Tools
- ETAP: commonly used for industrial power system modelling, short-circuit studies and protective-device coordination.
- ETAP Protection & Coordination: official protection coordination solution information.
- DIgSILENT PowerFactory: supports power system analysis and protection-related studies, depending on configuration and licensed functions.
- SKM Power*Tools: used for industrial power system studies and protective-device coordination.
- Manufacturer tools: relay configuration software may be used to prepare and verify device-specific settings.
Nevertheless, software results should be checked against verified input data, device manuals and engineering judgement. A plot generated by software is not, by itself, proof that a protection scheme is suitable.
Industrial Applications of Relay Coordination Studies
For this reason, relay coordination is important wherever electrical systems include multiple levels of protection and a fault should be isolated selectively.
- Industrial manufacturing plants.
- Oil, gas and petrochemical facilities.
- Utility substations and distribution networks.
- Commercial buildings and large campuses.
- Data centres and critical power systems.
- Renewable energy installations and battery storage systems.
- Water treatment and infrastructure facilities.
- Large motor and process plants.
In addition, for new installations, the study supports design and commissioning. Likewise, for existing facilities, it can be valuable after transformer replacement, feeder additions, generator installation, utility changes or other modifications that affect fault levels or protection settings.
Frequently Asked Questions
1. What is a Relay Coordination Study?
In summary, a Relay Coordination Study checks whether protective relays and related devices operate in the intended sequence during faults, with primary protection clearing the fault first and backup protection operating if needed.
2. What are TCC curves?
Time-current characteristic curves show how a protective device's operating time changes with current. In practice, engineers use them to review coordination between devices and check relevant equipment limits.
3. Why is a short-circuit study needed?
More specifically, short-circuit results provide fault-current values used to assess relay sensitivity, operating times and coordination under relevant maximum and minimum fault conditions.
4. Does relay coordination use the same method for every relay?
No. Overcurrent relays are often assessed using time-current curves, while differential, distance, busbar and breaker-failure schemes require checks appropriate to their protection principles and design.
5. When should a Relay Coordination Study be updated?
For this reason, it should be reviewed when changes to the network, equipment, sources, transformer configuration, fault levels, relay models or protection philosophy could affect settings or coordination.
6. Can relay settings be copied from a similar project?
Therefore, settings from another project should not be adopted without engineering verification. After all, the network fault levels, equipment, CT ratios, device characteristics and protection requirements may differ.
Related Engineering Services
Ultimately, relay coordination is most effective when supported by reliable network data and complementary engineering studies. Explore these related services and guides from Aums Praxis:
- Power System Studies
- Load Flow Analysis
- Electrical Network Analysis
- Transformer Protection
- Arc Flash Study
- Electrical Engineering Services
Conclusion
Relay Coordination Study is therefore an essential part of protection engineering for industrial, commercial and utility electrical networks. By reviewing relay settings, time-current curves, fault levels, circuit-breaker operation and backup protection, engineers can assess whether faults are isolated in the intended sequence.
Furthermore, a reliable study uses current equipment information, credible operating scenarios and the protection philosophy defined for the project. Additionally, it documents assumptions, recommended settings and the checks needed before implementation.
Whether the project involves a new installation, an expansion or an existing network modification, a properly scoped Relay Coordination Study helps support selective protection, equipment protection and dependable electrical system operation.
For more information, explore Aums Praxis Power System Studies or visit our contact page to discuss your project requirements.
Need a Relay Coordination Study?
Aums Praxis supports electrical engineering projects with Power System Studies and protection-related engineering services for industrial, commercial, utility and renewable energy applications.
Contact Our Engineering Team